Skip common site navigation and headers
United States Environmental Protection Agency
National Pollutant Discharge Elimination System (NPDES)
Begin Hierarchical Links EPA Home > OW Home > OWM Home > NPDES Home > Stormwater > Stormwater Discharges from Construction Activities End Hierarchical Links
Basic Information
 
Municipal MS4s
 
Construction Activities
- Construction General Permit eNOI
 
Industrial Activities
- Multi-Sector General Permit eNOI
 
Road-Related MS4s
 
Menu of BMPs
 
Green Infrastructure
 
Integrated Municipal Plans
 
 
 
Stormwater Home

 

NPDES Topics Alphabetical Index Glossary About NPDES

Stormwater Discharges From Construction Activities

OVERVIEW

Silt Fence at Construction Site

Stormwater runoff from construction activities can have a significant impact on water quality. As stormwater flows over a construction site, it can pick up pollutants like sediment, debris, and chemicals and transport these to a nearby storm sewer system or directly to a river, lake, or coastal water. Polluted stormwater runoff can harm or kill fish and other wildlife. Sedimentation can destroy aquatic habitat, and high volumes of runoff can cause stream bank erosion. Debris can clog waterways and potentially reach the ocean where it can kill marine wildlife and impact habitat.

The NPDES stormwater program requires construction site operators engaged in clearing, grading, and excavating activities that disturb 1 acre or more, including smaller sites in a larger common plan of development or sale, to obtain coverage under an NPDES permit for their stormwater discharges. Most states are authorized to implement the Stormwater NPDES permitting program. EPA remains the permitting authority in a few states, territories, and on most land in Indian Country. In areas where EPA is the permitting authority, operators must meet the requirements of the EPA Construction General Permit (CGP).

WHAT CAN I FIND ON THIS WEB SITE?

To access the full list of NPDES stormwater information, use the navigation tool box on the right side of this page.

General Construction Highlights

EPA-Specific Information

  • EPA's Construction General Permit - EPA's permit for unauthorized states, most territories, and Indian Country that outlines a set of provisions construction operators must follow to comply with the requirements of the NPDES stormwater regulations.
  • Electronic Notice of Intent (eNOI) System - Allows operators to quickly apply for permit coverage under EPA's CGP.
  • Search, Sort, and View 2012 CGP NOIs and LEWs - Searchable database of Notices of Intent (NOIs) for construction projects covered under EPA's 2012 CGP and projects covered under the LEW waiver on or after September 10, 2013 in areas where EPA is the NPDES permitting authority.
  • Search, Sort, and View 2008 CGP NOIs and LEWs - Searchable database of Notices of Intent (NOIs) for construction projects covered under EPA's expired 2008 CGP and projects covered under the LEW waiver before September 10, 2013 in areas where EPA is the NPDES permitting authority.
National Pollutant Discharge Elimination System Home

Stormwater Information
Recent Additions

FAQs

Publications

Regulations

Training & Meetings

Links

Contacts

 
 Register to Receive NPDES News Alerts!  

You will need Adobe Reader to view some of the files on this page. Files are best viewed in Internet Explorer and Adobe 8.0 or higher. See EPA's PDF page to learn more.

 

Office of Water | Office of Wastewater Management | Disclaimer | Search EPA

Begin Site Footer

EPA Home | Privacy and Security Notice | Contact Us

Last updated on September 10, 2013 11:41 AM
URL:http://cfpub2.epa.gov/npdes/stormwater/const.cfm