| VPAB4112O |
|
| Vessel Owner/Operator Name: |
General Electric Capitol Corporation c/o National Response Corporation
|
| IRS EIN: |
|
| IMO: |
|
| Country: |
United States |
| Address: |
3500 Sunrise Hwy Suite T-103 |
| City/State/ZIP: |
Great River/NY/11739 |
| Phone: |
631-224-9141 |
| Fax: |
631-224-9802 |
| Vessel Company Email : |
iocdo@nrcc.com |
| Vessel Name: |
NRC Quest |
| Vessel Identifier: |
9271195 |
| Vessel Identifier Type: |
Vessel IMO Number |
| Vessel Call Sign: |
WDF7619 |
| Flag State/Port of Registry: |
USA/New Orleans |
| Type of Vessel: |
Other
|
| Vessel Dimensions: |
Weight: 94 gross registered tons
Length: 144 feet
|
| Ballast Water Capacity: |
81100 gallons |
|
|
| Year Vessel Built: |
2002 |
| Date of last dry-dock: |
06/01/2011 |
| Date of next scheduled/anticipated dry-dock: |
06/01/2014 |
|
|
| Does the vessel have onboard treatment systems for any other waste stream covered by this permit (e.g. Advanced Wastewater Treatment System for Graywater, Oily Water Separator)?: |
Y |
| Waste Stream |
Treatment System Type/Design and Manufacturer |
Treatment System Capacity |
|
Red Fox PF-750-FP 38 person/24 hr black water treatment |
15 person/24 hr black and gray water treatment |
|
|
|
|
|
| How often is the ballast tank cleaned and sediment disposed of? |
Twice in 5 years |
| How and where do you typically dispose of ballast tank sediment? |
Shipyard drydock period |
| Does vessel have an existing ballast water management plan? |
Y |
| Type of anti-fouling hull coating on the vessel: |
International Inter Speed 640 |
| When anti-fouling hull coating was last applied: |
06/01/2011 |
| Describe hull husbandry practices, such as frequency of cleaning, method used, etc: |
Each dydock cycle. Twice in 5 years. In Seattle WA using hand scrape and pressure washing |
|
| Does vessel currently have, or has vessel ever held, an NPDES permit, for any part, discharge, or operation of the vessel? |
N |
| Permit Number: |
|
| Dates of Coverage: |
|
|
| Is this a transfer of ownership? |
Y |
| Date of Transfer: |
06/01/2011 |
|
| Home Port / Most Frequented US Port: |
Astoria OR |
| US Ports Vessel Anticipates Visiting During Permit Term: |
Port Angeles WA and Seattle WA |
| Number of overnight berths: |
Passenger:16 Crew:4 |
| Maximal capacity: |
Passenger:16 Crew:4 |
| Does vessel travel beyond the US EEZ and more than 200nm from any shore? |
N |
| Is the vessel engaged in Pacific Nearshore Voyages? |
Y |
|
| Applicable discharges vessel may generate: |
Deck Washdown and Runoff; Ballast Water; Anti-fouling hull coatings; Chain Locker Effluent; Distillation or Reverse Osmosis Brine; Firemain Systems; Graywater |
| Does Vessel ever engage in or have capacity to engage in industrial operations? |
Y |
| If yes, specify industrial operations: |
Other - Offshore Construction, Diving Operations |
|
| Will the vessel be using an experimental ballast water treatment system which discharges residual biocides or derivatives? |
N |
| If yes, are biocide concentrations below those listed in Part 5.8 of the Permit? |
|
| Biocide residuals or derivatives that may be discharged by the ballast water treatment system: |
|
|
| Certifying Official Name: |
Jonathan Boos |
|
| Prepared By: |
|